The Grading and Excavation Contractor Blogs

The Blogger

John Trotti Grading & Excavation Contractor Editor

More from this blogger

  1. Standardization
  2. Vocational Education in Your Local Schools
  3. Glimmers from Deep in the Tunnel
  4. Tiers to the Fore
  5. Attaboys
  6. Do You Feel the Economy Stirring
  7. Stimulus Funds What's Next
  8. Investing in Training and Technology
  9. We All Need Some Idle Time - But Our Engines Don't
  10. Just the Facts, Ma'am
  11. Paperless Grading & Excavation Contractor
  12. Staying Focused at the Job Site
  13. You Ain't Seen Nothing Yet
  14. Saving Our Soil
  15. Transmixers
  16. Get Ready for Our May Issue
  17. Landfill Construction
  18. Jobsite Communications
  19. Simulated Dirt
  20. Hunkering Up to Meet the Future
  21. Health Care Assault on Construction Firms
  22. Who Checks Your Six
  23. Training It Starts with Your Image
  24. Is there a Moore's Law in Construction
  25. Technology How Much Is Enough
  26. Getting Set for Our Technology Issue
  27. World of Concrete 2010 - Still a Firm Foundation
  28. The Bottomest Line
  29. Life Beyond the School of Hard Knocks
  30. Developing and Using Standards
  31. A Late-Night Present From the Senate
  32. Commitment Rather than Change
  33. Lessons From Power-Gen
  34. The Action Desk
  35. NGVs for Fleet Operations
  36. Stimulus Funds for Infrastructural Repair Show Me the Dough
  37. Are You Ready for the GHG Emissions Inspector
  38. Do Statistics Tell the Safety Story
  39. LiDAR What is it and Why Should I Care
  40. Consolidation Happens
  41. Equipment Theft in a Tough Economy
  42. ICUEE 2009
  43. Standardization
  44. Causes That Matter
  45. Hard Hats and Safety Harnesses - but Situational Awareness Above All
  46. Signs of the Times That Make Sense
  47. The Human Element
  48. Infrastructure in Dire Need of Overhaul
  49. All in it Together
  50. Pride in Accomplishment It's Part of Our Nature
  51. Y2K Plus Ten
  52. CNH Parts & Service Remanufacturing
  53. Construction Accidents Better But Still Too Many
  54. Not Like Your Father's Crawler
  55. Equipment Theft A Bigger Business Than Ever
  56. Two Days, Three Nights in Peoria
  57. Regulatory Compliance
  58. Fugitive Dust
  59. A Case for Dirtmanship
  60. Are We Still Having Fun
  61. The Best BMP for Erosion & Sediment Control is Knowledge
  62. Snoopy's Doghouse
  63. Leave Close at the Horseshoe Pit
  64. Bailouts, Stimuli, and our Future
  65. Tsunamis in the Sea of Change
  66. Rising to the Challenge of Change
  67. Fox in the Henhouse
  68. Writing Checks Our Resources Can't Cover
  69. Trenching Safety
  70. Dimensions 2009
  71. Bottom Lines
  72. Speed, Precision, and Awareness
  73. World of Concrete 2009
  74. Paperless iGrading & Excavation Contractor-i
  75. Tightening the Belt One Notch at a Time
  76. Operation Head Start
  77. Stimulating Thoughts
  78. Start the Year with PMA
  79. Staying Out of the Crosshairs
  80. Employee Free Choice Act (FCA)
  81. Keeping Pace with Workforce Change
  82. Forward to the Future
  83. Investing in Training and Technology
  84. Focusing on the Future
  85. Southern California Fires
  86. Bottom Lines
  87. In Pursuit of the Digital Jobsite
  88. Situational Awareness
  89. Coming to Grips with Change
  90. Sweeping Up the Scraps
  91. How're the Fish Biting Today
  92. Welcome to the New Site!
view all

GX Contractor Editor's Blog

August 31st, 2009 10:30am PST

Whoop-De-Doozy

Posted By John Trotti Comments

If talents from this life are transferrable to the next, I’ll have a lock on making whoop-de-doos for motocross courses around the globe. Just put me at the controls of a dozer and turn me loose…which is exactly what John Dice, senior training manager for Topcon Positioning Systems in Livermore, CA, did.

After pointing out the features of the John Deere 750J, and pointing me down a relatively smooth track, he gave me my final instructions for making a couple of manually controlled 2/10s slices with the transmission control set to at a comfortable mid-range speed. “Stay out of the lake,” was his final warning as I clanked off in search of fame and glory.

Things went well for the first 6 feet, which was when the tracks dropped into the leading edge of my cut, reorienting the blade to a greater angle. Thus began a series of gouges varying in depths up to 6 inches or so. By the time I reached the end of the southbound pass my humility quotient had risen to a point just below the “draw sword and write your haiku” line, but I was now ready to show my true metal to the group of witnesses who were eagerly awaiting my return run.

“I’ll show them,” I said as I plowed through a rapid 180-degree turn, took a deep breath, lowered the blade for action, and dialed in maximum speed. What followed was a sequence of pitch-and-dive maneuvers, augmented this time by rolls that left a trail of butchered earth worthy of the Baja 1000. Clearly I had gone well past the “open up your belly” point and was about to do so when Dice came up to congratulate me.

“Great job,” he said. “Perfect for showing what the 3D-MC2 system can do.”

All I wanted to do at that moment was to go lie down in one of my unintended swales and have someone bury me, but as he explained array of displays and how to engage the blade control system, I saw that my ordeal was far from over.

Lined up on the track once more with the original site plan set into the system’s memory, I flicked the little knob on the blade control handle to the “on” position, pushed the transmission lever forward, once again ran the speed control full up, and, my right hand in my lap, fully expecting to see the machine bury itself in one of my trenches.

On the outbound leg, the dozer bogged from time to time trimming off the more serious of my prior achievements, but by the time I returned to the starting point, the entire track was at the site plan specification.
There are a number of features that make the 3D-MC2 system different from its predecessors; chief among which are its employment of 3-axis gyros to stabilize the blade’s position in space, the set of dozer-specific algorithms allowing it to anticipate pitch moments, and it’s five-times increase in blade-control instructions. Any one of these would be an improvement, but it the combination that really does the trick. Face it, at 10 kph, you could ready the Baja 1000 course for your family sedan in less than three weeks…but please don’t.

What Do You Think?

Post a Comment

Be the first to tell us what you think!

Post a Comment

Not a subscriber? Sign Up
 
 
*  
 




 

Get GX Contractor Email Updates!

Get weekly news and updates through our GX Contractor email newsletter!