The Grading and Excavation Contractor Blogs

The Blogger

John Trotti Grading & Excavation Contractor Editor

More from this blogger

  1. Vocational Education in Your Local Schools
  2. Glimmers from Deep in the Tunnel
  3. Tiers to the Fore
  4. Attaboys
  5. Do You Feel the Economy Stirring
  6. Stimulus Funds What's Next
  7. Investing in Training and Technology
  8. We All Need Some Idle Time - But Our Engines Don't
  9. Just the Facts, Ma'am
  10. Paperless Grading & Excavation Contractor
  11. Staying Focused at the Job Site
  12. You Ain't Seen Nothing Yet
  13. Saving Our Soil
  14. Transmixers
  15. Get Ready for Our May Issue
  16. Landfill Construction
  17. Jobsite Communications
  18. Simulated Dirt
  19. Hunkering Up to Meet the Future
  20. Health Care Assault on Construction Firms
  21. Who Checks Your Six
  22. Training It Starts with Your Image
  23. Technology How Much Is Enough
  24. Getting Set for Our Technology Issue
  25. World of Concrete 2010 - Still a Firm Foundation
  26. The Bottomest Line
  27. Life Beyond the School of Hard Knocks
  28. Developing and Using Standards
  29. A Late-Night Present From the Senate
  30. Commitment Rather than Change
  31. Lessons From Power-Gen
  32. The Action Desk
  33. NGVs for Fleet Operations
  34. Stimulus Funds for Infrastructural Repair Show Me the Dough
  35. Are You Ready for the GHG Emissions Inspector
  36. Do Statistics Tell the Safety Story
  37. LiDAR What is it and Why Should I Care
  38. Consolidation Happens
  39. Equipment Theft in a Tough Economy
  40. ICUEE 2009
  41. Standardization
  42. Causes That Matter
  43. Hard Hats and Safety Harnesses - but Situational Awareness Above All
  44. Signs of the Times That Make Sense
  45. The Human Element
  46. Whoop-De-Doozy
  47. Infrastructure in Dire Need of Overhaul
  48. All in it Together
  49. Pride in Accomplishment It's Part of Our Nature
  50. Y2K Plus Ten
  51. CNH Parts & Service Remanufacturing
  52. Construction Accidents Better But Still Too Many
  53. Not Like Your Father's Crawler
  54. Equipment Theft A Bigger Business Than Ever
  55. Two Days, Three Nights in Peoria
  56. Regulatory Compliance
  57. Fugitive Dust
  58. A Case for Dirtmanship
  59. Are We Still Having Fun
  60. The Best BMP for Erosion & Sediment Control is Knowledge
  61. Snoopy's Doghouse
  62. Leave Close at the Horseshoe Pit
  63. Bailouts, Stimuli, and our Future
  64. Tsunamis in the Sea of Change
  65. Rising to the Challenge of Change
  66. Fox in the Henhouse
  67. Writing Checks Our Resources Can't Cover
  68. Trenching Safety
  69. Dimensions 2009
  70. Bottom Lines
  71. Speed, Precision, and Awareness
  72. World of Concrete 2009
  73. Paperless iGrading & Excavation Contractor-i
  74. Tightening the Belt One Notch at a Time
  75. Operation Head Start
  76. Stimulating Thoughts
  77. Start the Year with PMA
  78. Staying Out of the Crosshairs
  79. Employee Free Choice Act (FCA)
  80. Keeping Pace with Workforce Change
  81. Forward to the Future
  82. Investing in Training and Technology
  83. Focusing on the Future
  84. Southern California Fires
  85. Bottom Lines
  86. In Pursuit of the Digital Jobsite
  87. Situational Awareness
  88. Coming to Grips with Change
  89. Sweeping Up the Scraps
  90. How're the Fish Biting Today
  91. Welcome to the New Site!
view all

GX Contractor Editor's Blog

March 1st, 2010 1:22pm PST

Is there a Moore's Law in Construction?

Posted By John Trotti Comments

Simply put, Moore’s Law, the basis for which was proposed by Intel cofounder Gordon E. Moore in a 1965 paper, says that the number of transistors that can be economically put on a computer chip will double every two years. While it wasn’t until 1970 that the hypothesis was accorded the status of “law,” its performance has shown such incredible durability clear to the present that it forms the basis for financial projections by many of the leading industrial and governmental organizations worldwide, and the model for other technological projections as well.

Year CPU Transistors

1970

1000

1980

50000

1990

1000000

2000

75000000

2008

2000000000

 

So what about the construction industry?

Technology has always played a role in construction, though it wasn’t until the approach of the new millennium that it began to move from the engineering and business offices to the field. Then, in the aftermath of the Y2K scare, we’ve witnessed the equivalent of a dam burst of technological advances as all aspects of construction get gobbled up by the digital monster…but to what end?

At some time in the future it may be possible to equate computer and earthmoving performance, but for the present the two live in different time scales. When Moore voiced his vision, the semiconductor revolution was nearly two decades old, yet the bulk of computing at that late date was still performed by machines containing legions of vacuum tubes; housed in huge climate-controlled, dust-free buildings; served and maintained by legions of technicians in white lab coats who spoke a language unintelligible to the bulk of the people on the planet. The space race with its requirement for lightweight, miniaturized systems drove much of the growth in processing power during the 1960s, but it would not be until the late 1970s and the arrival of VisiCalc—the “magic app” spreadsheet—that the digital revolution moved from the Fortune 500 domain to Main Street and beyond in successive leaps.

How different is that from where we find ourselves today in the construction world? Not much, I suspect, except for where “bloat” comes into play. In the computer world, bloat is a consequence of computing power. Without generations of baggage to take into account, programmers were able to start with what amounted to a blank piece of paper. Instead, the baggage (bloat) that’s there today is of their own making. In construction, the situation is nearly reversed, with the baggage well established, forcing technology to incorporate it before paring it down.

For the past decade we’ve seen the basic tools come into being against a backdrop of what seemed to many an almost limitless demand for construction services. But with the downturn, that’s gone. In its place we have what amounts to a dog-eat-dog environment where only the strongest will survive. The strongest will be those who can do more with less, and guess where that’s going to come from.

What Do You Think?

Post a Comment

Be the first to tell us what you think!

Post a Comment

Not a subscriber? Sign Up
 
 
*  
 




 

Get GX Contractor Email Updates!

Get weekly news and updates through our GX Contractor email newsletter!